SG685 transets |
Based on high voltage usage over previous 2 dives: dives remaining : 20405 (231.6 days at current dive duration) projected end date: 30-May-2024 12:32:38 (to 5% capacity) |
dive | end time (UT) |
length (min) |
depth (meters) |
lat | lon | dog (km) |
cog | dtw (km) |
ctw | dtg (km) |
ctg | Umag (cm/s) |
Udir | dive | climb | high V | low V | errors | retries | ||||||||||||||
pitch | rollL | rollR | pitch | rollL | rollR | volts | kJ | % cap | volts | kJ | % cap | TT8 | CF8 | pit | rol | VBD | pit | rol | VBD | ||||||||||||||
872 l c | 23/10/11 22:58 | 12 | 30.40(30.00) | 44 33.44 | -123 17.05 | 0.00 | 0.0 | 0.00 | 15.6 | 20.0 | 260.1 | 0.6 | 0.00 | -18.7 | 1 | 0 | 20.0 | 0 | 1 | 15.3 | 1.0 | 99.9 | 15.0 | 0.0 | NaN | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
871 l c | 23/10/11 22:41 | 12 | 30.20(30.00) | 44 33.44 | -123 17.05 | 0.00 | 160.4 | 0.00 | 15.6 | 20.0 | 260.1 | 0.4 | 270.00 | -18.7 | 1 | 0 | 20.0 | 0 | 1 | 15.3 | 0.0 | 99.9 | 15.0 | 0.0 | NaN | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |